Project Gallery
Olympic Ski Jump
The 2010 Olympic Ski Structures were erected by KWH Constructors. 14 km south of Whistler, the Whistler Nordic venue features a 95m “normal hill” and a 125m “large hill” ski jump as well as biathlon and cross country events.
William R. Bennett Bridge
KWH used specialized shoring to erect this floating bridge across the Okanagan Lake.
JRI Leg Pulley
KWH replaced the head pulleys from 2 vertical conveyors at the Richardson International Terminal.
Toyota Wheel Manufacturing Plant
KWH erected this steel frame building challenged by the limited space.
Equatorial Guinea LNG Suspension Bridge
KWH was subcontracted to erect this suspension bridge for the LNG pipeline.
Aurora Bridge
KWH performed strengthening and reinforcing to increase the Aurora Bridge’s seismic resistance.
George Massey Tunnel
KWH executed the seismic retrofit of the tunnel using steel plates to strengthen the sections and joints.
Pattullo Bridge Retrofit
KWH executed various replacements and additions of members along the length of the Pattullo Bridge.
Westshore Quadrant Shiploader Recovery
KWH was the sole contractor to execute an emergency recovery of two shiploaders.
Saskatchewan Wheat Pool
KWH provides maintenance and replacement services for this waterfront grain facility.
Port Mann Bridge Upgrade
KWH took on the widening of the full length of the bridge and upgraded it to modern seismic safety standards.
Gitwinksihlkw Bridge
Due to limited accessibility, KWH utilized a temporary launch nose to erect this bridge over the Nass River.
Bellevue Access
KWH executed a tandem crane lift to erect the large curved box girders for the interchange over I-90.