Sterling Creek Bridge

Location

Hedley, British Columbia

Project Description

Due to environmental restrictions this single 67m span, three-plate, skewed girder bridge was launched over this salmon spawning stream.

A six-legged bent was positioned adjacent to the stream carrying 150 ton capacity rockers each with two seventy-five ton rollers. A twenty metre long temporary nose was used with the pulling beam attached to it.

The bridge was pulled across the gap by a winch at bearing level since the abutment back-walls were not yet poured.

Contractor

Coquitlam Ridge Construction Ltd

Fabricator

Solid Rock Steel

Timeline

1996